Red Post Lane – temporary closure

The roads either side of Red Post bridge are to be closed for 3 days from the 13th May for resurfacing.

Red Post Lane and the road leading from the bridge to Cattle Lane will both be re-surfaced.

Cllr David Bateman has organised a litter-pick from Sunnybank down to the grain store entrance of Manor Farm. If you are able to help then please contact David by email – davebateman@btinternet.com

 

This entry was posted in News.

2 comments on “Red Post Lane – temporary closure

  1. John Chaffey says:

    The information on the Red Post Bridge closure seems a little vague, 1/ Is there a recommended route for Sunnybank etc. 2/ Is there to be a paper drop for those without computers.

    Like

    • John. It is Red Post Lane and the other road leading to Cattle Lane that are to be closed. So I do not see that there needs to be a recommended route or a paper drop for info. I am assuming you wrote this post in relation to my original post where I had my wires crossed and thought the bridge was being closed – which is NOT the case. Sarah. MPC

      Like

Have your say...

This site uses Akismet to reduce spam. Learn how your comment data is processed.